- Autogrid Rings and C-ClipsPremium quality Autogrid Rings and C-Clips for clipping cryo-EM grids. Compatible in most Cryo-EMs and autoloader systems.Average lead time: 21 to 40 days
POA
Average lead time: 21 to 40 days - 'Introduction to Cryo-EM' Consumables Kit AGG5010'Intro to Cryo-EM' Consumables Kit including a selection of Cryo TEM grid boxes, Dumont Tweezers, with a pack of ten R2/2 Quantifoils.In Stock
POA
In Stock - Foam Dewar for FEI Vitrobot SystemA well-priced, robust dewar with metal parts for cryo-EM sample preparation.Average lead time: 1 to 14 days
POA
Average lead time: 1 to 14 days - Metal Cryo Grid BoxMetal grid storage boxes designed for use in cryogenic conditions.Average lead time: 1 day
POA
Average lead time: 1 day - Plastic Cryo Grid BoxTested for biodegradability and durability, these plastic grid boxes are available in 3 different colours for maximum contrast. Suitable for use with both unclipped and clipped standard 3 mm electron microscopy grids.Average lead time: 1 to 21 days
POA
Average lead time: 1 to 21 days - Hybrid Cryo Grid BoxHybrid cryo-EM sample storage box with unique serial number and dedicated wells for both unclipped grids and autogrids. Available with pin lid or without pin lid.Average lead time: 1 to 14 days
POA
Average lead time: 1 to 14 days - Bulk Storage Cryo Grid BoxBulk storage grid box with unqiue serial number designed to accomodate an entire 12-grid cassette.Average lead time: 1 to 14 days
POA
Average lead time: 1 to 14 days - Pin Lid for Cryo Grid Box AGK120Pin lids for use with hybrid cryo grid boxes and bulk storage cryo grid boxes.Average lead time: 14 days
POA
Average lead time: 14 days - Autogrid Inspection Tool AGK125The Autogrid Inspection Tool enables a final check of clipping quality before loading autogrids into the autoloader cassette.Average lead time: 14 days
POA
Average lead time: 14 days - Ethane Condenser AGK123Custom-designed ethane condenser designed to securely fit AGK114 Spider, or the FEI/Thermofisher equivalent.Average lead time: 14 days
POA
Average lead time: 14 days - Clipping StationOptimised for the clipping workflow, the clipping station provides easy and efficient clipping of Cryo-EM grids for Thermo Fisher autoloader-based microscopes.Average lead time: 14 days
POA
Average lead time: 14 days - Clipping Tools and RackCompact-design clipping tool compatible with the AGK130 clipping station and the Thermo Fisher clipping station.Average lead time: 1 to 14 days
POA
Average lead time: 1 to 14 days - C-Clip Bottoming Tool AGK133The C-Clip bottoming tool provides an easier and more efficient way to 'bottom' the C-Clip at the tip of the barrel of a clipping tool prior to clipping.In Stock
POA
In Stock - Reverse Action Autogrid Tweezers AGK134These reverse-action autogrid tweezers maintain the same tip geometry as traditional autogrid tweezers, but with a reverse-action handle.In Stock
POA
In Stock - UVC3 Cryo ChamberPELCO Cryo Chamber specifically designed for cryo specimen preparation.Average lead time: 14 to 30 days
POA
Average lead time: 14 to 30 days - Specimen pins for cryo-ultramicrotomy - pack of 50 AGG3465These aluminium specimen mount pins are suitable for mounting samples for cryo-ultramicrotomy.Average lead time: 14 days
POA
Average lead time: 14 days - Cryo Freezer HatsThese freezer hats for holding specimens in high pressure freezing equipment are available in brass only.Average lead time: 14 days
POA
Average lead time: 14 days - Mini Copper Pin Stubs for CryoMini pin stubs are ideal for small samples, or parts which need to be examined individually.Average lead time: 14 days
POA
Average lead time: 14 days - Blotting Paper for Plunge FreezersBlotting filter paper for FEI Vitrobot, or Leica EM GP.Average lead time: 1 to 30 days
POA
Average lead time: 1 to 30 days - Easiglow discharge cleaning systemA compact, stand alone, easy to use discharge cleaning system primarily designed for surface modification of TEM support films.Average lead time: 1 to 28 days
POA
Average lead time: 1 to 28 days