High transmission thin bar grids for TEM applications.
- 200, 300, 400, 600, 700 & mixed meshes available
- Square pattern or hexagon pattern
- Copper, Nickel or Gold
- Thin Bar, High Transmission 200 Mesh TEM Support Grids200 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper or Gold.Average lead time: 1 to 11 days
POA
Average lead time: 1 to 11 days - Thin Bar, High Transmission 300 Mesh TEM Support Grids300 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 11 days
POA
Average lead time: 11 days - Thin Bar, High Transmission 400 Mesh TEM Support Grids400 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 1 to 11 days
POA
Average lead time: 1 to 11 days - Thin Bar, High Transmission 600 Mesh TEM Support Grids600 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 11 to 27 days
POA
Average lead time: 11 to 27 days - Thin Bar, Hex 200 Mesh TEM Support Grids200 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 1 to 11 days
POA
Average lead time: 1 to 11 days - Thin Bar, Hex 300 Mesh TEM Support Grids300 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 4 to 11 days
POA
Average lead time: 4 to 11 days - Thin Bar, Hex 400 Mesh TEM Support Grids400 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 11 days
POA
Average lead time: 11 days - Thin Bar, Hex 600 Mesh TEM Support Grids600 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 4 to 11 days
POA
Average lead time: 4 to 11 days - Thin Bar, Hex 700 Mesh TEM Support Grids700 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 1 to 11 days
POA
Average lead time: 1 to 11 days - Thin Bar, Mixed Mesh TEM Support GridsMixed mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 11 days
POA
Average lead time: 11 days