- 28 mm Spare Disc TargetsHigh purity 28 mm spare disc targets for sputter coaters.Average lead time: 34 days
POA
Average lead time: 34 days - EasiShaper Carbon Rod ShaperThe PELCO easiShaper™ is an electric motor driven carbon rod sharpener which offers easy, quick and clean carbon rod shaping for carbon evaporators which are using either 1/4", 1/8" or 3/16" stepped carbon or graphite rods.Average lead time: 1 to 29 days
POA
Average lead time: 1 to 29 days - Shaped carbon rodsThese are softer (graphite type) carbon rods, 55mm long, pre-shaped and ready for use in the vacuum coating unit.Average lead time: 1 day
POA
Average lead time: 1 day - Average lead time: 1 day
- Average lead time: 1 to 69 days
- Molybdenum boats for aperture cleaning AGE446These boats accommodate several aperture discs which should be heated in a vacuum chamber to bright red heat for cleaning.In Stock
POA
In Stock - Ready made evaporation sources - filamentsTungsten filaments offer a convenient ready prepared, reproducible evaporation sources.Average lead time: 1 day
POA
Average lead time: 1 day - Evaporation MetalsHigh purity wires and materials for use in evaporation and shadow casting.Average lead time: 1 to 89 days
POA
Average lead time: 1 to 89 days - Hand tool for carbon rod shaping AGT592This is a high precision hand-held tool for shaping carbon rods to make cylindrical tips.In Stock
POA
In Stock - Carbon rod sharpener AGT579A simple sharpener that gives a good conical point on carbon rods.In Stock
POA
In Stock - Carbon fibreEvaporation of braided carbon fibre gives a very reproducible film thickness.Average lead time: 1 to 13 days
POA
Average lead time: 1 to 13 days - Protective goggles AGG395Protective goggles with coloured glass in flip-front for observing the evaporation process.In Stock
POA
In Stock - Spare PartsReplacement spare parts including glass chambers, gaskets, valves and vacuum gauges can be supplied for current and older models of Agar, Polaron/Bio-Rad/VG and Edwards coating units.Average lead time: 13 days
POA
Average lead time: 13 days - Chromium chips (100g) AGE435High purity 99.9% chromium chips graded for use with wire baskets.Average lead time: 13 days
POA
Average lead time: 13 days - “Air-Out” Vacuum System, 220V AGY5551“Air-Out” Vacuum System, 220V for removal of air bubbles from the epoxy resin mixture, providing enhanced bonding and embedding quality.In Stock
POA
In Stock