The Micro-Analysis Consultants range of standards can be supplied individually or in the form of multi-element sets either fixed or as a selection to the choice of the user. Standards can be supplied that are suitable for energy dispersive or wavelength dispersive X-ray microanalysis systems. All standards are supplied with fully authenticated certificates of analysis and a location map for standard identification. A Faraday cup for accurate specimen current measurements is available as an optional extra on all mounts. The standards are polished to a ¼μm diamond finish and carbon coated. They are available in a variety of brass holders, 25mm or 32mm diameter blocks containing up to 50 standards, carousels, 13mm diameter blocks to fit pin stubs, or individual tubes of 2mm, 3mm or 5mm diameter.
- Basic calibration set AGS1928A set of six standards plus a Faraday cup mounted in a 25mm diameter block, designed to provide a wide range of calibrations and performance checks.In Stock
POA
In Stock - SEM Multi-purpose Calibration Block AGS1919This set combines a number of test specimens in a single 32mm diameter holder.Average lead time: 27 days
POA
Average lead time: 27 days - Quality control test calibration block AGS1957The quality control test calibration block is a round brass block with four test samples, a Faraday cup, a particle feature, two resolution standards and a magnification grid.Average lead time: 13 days
POA
Average lead time: 13 days - Universal Standard Block - 45 Standards with Faraday cupA set of 45 standards and a Faraday cup.Average lead time: 29 to 44 days
POA
Average lead time: 29 to 44 days - Universal Standard Block - Biological setA set of 18 standards and a Faraday cup suitable for biological applications.Average lead time: 29 to 44 days
POA
Average lead time: 29 to 44 days - Universal Standard Block - Semiconductor setA set of 21 standards chosen for semiconductor applications.Average lead time: 6 to 29 days
POA
Average lead time: 6 to 29 days - Standards for use in ultra high vacuum instrumentsThis series of standards is available for laboratories employing ultra high vacuum analysis instruments (Auger, EXCA, electron probe, SEM, etc.).Average lead time: 13 to 89 days
POA
Average lead time: 13 to 89 days - Faraday Cup AGS1929A Faraday cup for accurate specimen current measurements. Mounted in a 12.5mm pin stub.In Stock
POA
In Stock - Single XRF Standard for X-Ray Fluorescence SpectroscopyHigh purity single element standards for the setting-up, calibration and routine instrument monitoring of XRF spectrometers.Average lead time: 13 to 29 days
POA
Average lead time: 13 to 29 days - Standards for X-Ray Fluorescence SpectroscopyHigh purity single element standards for the setting-up, calibration and routine instrument monitoring of XRF spectrometers.Average lead time: 20 to 34 days
POA
Average lead time: 20 to 34 days - Average lead time: 29 days