Menu
ORDER ONLINE - quick & easy
AGENTS & DISTRIBUTORS - available worldwide
REQUEST QUOTES - fast online pricing

The Micro-Analysis Consultants range of standards can be supplied individually or in the form of multi-element sets either fixed or as a selection to the choice of the user. Standards can be supplied that are suitable for energy dispersive or wavelength dispersive X-ray microanalysis systems. All standards are supplied with fully authenticated certificates of analysis and a location map for standard identification. A Faraday cup for accurate specimen current measurements is available as an optional extra on all mounts. The standards are polished to a ¼μm diamond finish and carbon coated. They are available in a variety of brass holders, 25mm or 32mm diameter blocks containing up to 50 standards, carousels, 13mm diameter blocks to fit pin stubs, or individual tubes of 2mm, 3mm or 5mm diameter.

Filters

11 products available

You've viewed 11 of 11 products

  1. Basic calibration set AGS1928
    A set of six standards plus a Faraday cup mounted in a 25mm diameter block, designed to provide a wide range of calibrations and performance checks.
    In Stock

    POA

    In Stock
    Down
    Up
  2. SEM Multi-purpose Calibration Block AGS1919
    This set combines a number of test specimens in a single 32mm diameter holder.
    Average lead time: 27 days

    POA

    Average lead time: 27 days
    Down
    Up
  3. Quality control test calibration block AGS1957
    The quality control test calibration block is a round brass block with four test samples, a Faraday cup, a particle feature, two resolution standards and a magnification grid.
    Average lead time: 13 days

    POA

    Average lead time: 13 days
    Down
    Up
  4. Universal Standard Block - 45 Standards with Faraday cup
    A set of 45 standards and a Faraday cup.
    Average lead time: 29 to 44 days

    POA

    Average lead time: 29 to 44 days
  5. Universal Standard Block - Biological set
    A set of 18 standards and a Faraday cup suitable for biological applications.
    Average lead time: 29 to 44 days

    POA

    Average lead time: 29 to 44 days
  6. Universal Standard Block - Semiconductor set
    A set of 21 standards chosen for semiconductor applications.
    Average lead time: 6 to 29 days

    POA

    Average lead time: 6 to 29 days
  7. Standards for use in ultra high vacuum instruments
    This series of standards is available for laboratories employing ultra high vacuum analysis instruments (Auger, EXCA, electron probe, SEM, etc.).
    Average lead time: 13 to 89 days

    POA

    Average lead time: 13 to 89 days
  8. Faraday Cup AGS1929
    A Faraday cup for accurate specimen current measurements. Mounted in a 12.5mm pin stub.
    In Stock

    POA

    In Stock
    Down
    Up
  9. Single XRF Standard for X-Ray Fluorescence Spectroscopy
    High purity single element standards for the setting-up, calibration and routine instrument monitoring of XRF spectrometers.
    Average lead time: 13 to 29 days

    POA

    Average lead time: 13 to 29 days
  10. Standards for X-Ray Fluorescence Spectroscopy
    High purity single element standards for the setting-up, calibration and routine instrument monitoring of XRF spectrometers.
    Average lead time: 20 to 34 days

    POA

    Average lead time: 20 to 34 days
  11. Single Element Standards
    Single element standards.
    Average lead time: 29 days

    POA

    Average lead time: 29 days
Filters

11 products available

You've viewed 11 of 11 products

PRICE & AVAILABILITY: Please note that while we are working closely with our suppliers to minimise any global supply chain issues, prices and availability may be subject to change at short notice.
FILTERS
VIEW PRODUCTS Cancel