Menu
ORDER ONLINE - quick & easy
AGENTS & DISTRIBUTORS - available worldwide
REQUEST QUOTES - fast online pricing

Latest offers from Agar Scientific - only available while stocks last! 

Filters
Page

214 products available

You've viewed 24 of 214 products

  1. Tin on Carbon AGS1967 - Resolution Test Specimen
    Resolution test specimen with a particle size range from approximately 10 - 100nm.
    Average lead time: 1 to 45 days

    POA

    Average lead time: 1 to 45 days
  2. Silicon Carbide Pre-Grinding Paper Discs
    Waterproof silicon carbide papers are often preferred for pre-grinding operations because of their rapid cutting properties and close grain size.
    Average lead time: 1 to 7 days

    POA

    Average lead time: 1 to 7 days
  3. Metallised tapes with adhesive backing
    Metallised tapes with adhesive backing.
    Average lead time: 1 day

    POA

    Average lead time: 1 day
  4. Aniline Blue
    Fluorescent stain for glycogen.
    Average lead time: 7 to 30 days

    POA

    Average lead time: 7 to 30 days
  5. Blackline Microtubes and Storage boxes
    Completely opaque tubes and boxes ideal for the storage of photo sensitive solutions.
    Average lead time: 1 to 14 days

    POA

    Average lead time: 1 to 14 days
  6. Pen-Vac Straight Tip Metal Probes, 12.7mm length
    Straight tip, ESD-safe metal probes for use with the Pen-Vac and PELCO Vacuum Pick-Up System.
    Average lead time: 1 to 30 days

    POA

    Average lead time: 1 to 30 days
  7. Quantifoil R2/4 holey carbon films - Circular
    Circular, hole size 2µm dia, separation 4µm
    Average lead time: 1 to 200 days

    POA

    Average lead time: 1 to 200 days
  8. Bio Diamant Paste Series 100
    Diamond powder pastes designed for grinding and polishing work. 
    Average lead time: 35 days

    POA

    Average lead time: 35 days
  9. Demotec 15 Plus, Cold Embedding Resin
    Non-shrinking, expanding cold embedding resin for gap free embedding.
    Average lead time: 14 to 21 days

    POA

    Average lead time: 14 to 21 days
  10. Polyethylene vials
    Moisture proof vials with hinged caps which form an excellent seal for both liquids and solids.
    Average lead time: 7 to 28 days

    POA

    Average lead time: 7 to 28 days
  11. Grid Staining System
    Grid staining system for 25 grids, consisting of numbered grid holder and handle, cover and staining vessels (two supplied).
    Average lead time: 1 day

    POA

    Average lead time: 1 day
  12. Sample pins for Cryo-Ultramicrotomes
    Cryo sample pins with 2mm diameter pins compatible with Leica & RMC Cryo-Ultramicrotomes.
    Average lead time: 1 to 30 days

    POA

    Average lead time: 1 to 30 days
  13. Critical dimension (CD) calibration test specimens - 10-5-2-1-0.5um...
    This CD calibration test specimen comprises five line patterns, each one clearly identified by its pitch.
    Average lead time: 14 days

    POA

    Average lead time: 14 days
  14. Spatulas
    Stainless steel and nickel multi-purpose spatulas for a wide variety of lab applications.
    Average lead time: 1 to 14 days

    POA

    Average lead time: 1 to 14 days
  15. KLEEN Blade Management System
    The KLEEN blade management system (BMS) helps to support safe passing protocols and reduce sharp injuries.
    Average lead time: 1 to 14 days

    POA

    Average lead time: 1 to 14 days
  16. Bio Diamant Abrasive Suspension NEODIA P
    High performance polycrystalline diamond abrasive suspension.
    Average lead time: 35 days

    POA

    Average lead time: 35 days
  17. Polishing material
    Polishing material
    Average lead time: 14 days

    POA

    Average lead time: 14 days
  18. Scintillator discs - Plano P47
    All discs are 1mm thick, unless otherwise specified.
    Average lead time: 14 days

    POA

    Average lead time: 14 days
  19. Apertures, 4.0 x 0.6mm, Platinum/Iridium
    4mm dia, 0.6mm thick. Platinum/Iridium. High-quality disc apertures for use in electron microscopes, Focus Ion Beam, microprobe and X-ray systems.
    Average lead time: 45 to 90 days

    POA

    Average lead time: 45 to 90 days
  20. Crystalbond Adhesives
    Crystalbond adhesives allow temporary bonding of delicate crystals, metallurgical samples, glass components and ceramic substrates.
    Average lead time: 1 to 30 days

    POA

    Average lead time: 1 to 30 days
  21. Transport Tubes with Security Caps
    Transport tubes available in 5ml or 10ml.
    Average lead time: 14 days

    POA

    Average lead time: 14 days
  22. Ammonium Molybdate
    Negative stain. 25g or 100g.
    Average lead time: 21 days

    POA

    Average lead time: 21 days
  23. Eyepiece graticules - I,J,K + L
    The graticules are available in 16, 19 and 21mm diameters as standard.
    Average lead time: 7 to 30 days

    POA

    Average lead time: 7 to 30 days
  24. Apertures, 1.85 x 0.1mm, Platinum/Iridium
    1.85mm dia, 0.1mm thick. Platinum/iridium. High quality disc apertures for use in electron microscopes, Focus Ion Beam, microprobe and X-ray systems.
    Average lead time: 1 to 70 days

    POA

    Average lead time: 1 to 70 days
Filters
Page

214 products available

You've viewed 24 of 214 products

PRICE & AVAILABILITY: Please note that while we are working closely with our suppliers to minimise any global supply chain issues, prices and availability may be subject to change at short notice.
FILTERS
Colour
Hole Arrangement
Hole Diameter
Manufacturer
Mesh Size
Slot Size
Microscope Make
Range
Diameter
Material
Mesh Shape
Size
Thickness
Style
VIEW PRODUCTS Cancel