Menu
ORDER ONLINE - quick & easy
AGENTS & DISTRIBUTORS - available worldwide
REQUEST QUOTES - fast online pricing

Carbon is available as a solid rod or fibre source.

A comprehensive range of high purity wires for evaporation and shadow casting is available, including Gold, Gold palladium, Platinum, Platinum iridium, Molybdenum, Tungsten, Aluminium etc. All wires are supplied in a convenient dispenser. Various thicknesses and purities are available, details on request.

Filters
Page

14 products available

You've viewed 9 of 14 products

  1. Shaped carbon rods
    These are softer (graphite type) carbon rods, 55mm long, pre-shaped and ready for use in the vacuum coating unit.
    Average lead time: 1 day

    POA

    Average lead time: 1 day
  2. Carbon rods
    Carbon rods for vacuum coating.
    Average lead time: 1 to 12 days

    POA

    Average lead time: 1 to 12 days
  3. Carbon rod sharpener AGT579
    A simple sharpener that gives a good conical point on carbon rods
    Average lead time: 19 days

    POA

    Average lead time: 19 days
  4. Hand tool for carbon rod shaping AGT592
    This is a high precision hand-held tool for shaping carbon rods to make cylindrical tips.
    In Stock

    POA

    In Stock
  5. Platinum carbon rods for electron beam evaporation AGE434
    These carbon rods have been loaded with platinum and are ready for electron beam irradiation.
    Average lead time: 28 days

    POA

    Average lead time: 28 days
  6. Carbon fibre
    Evaporation of braided carbon fibre gives a very reproducible film thickness.
    Average lead time: 1 to 19 days

    POA

    Average lead time: 1 to 19 days
  7. Ready made evaporation sources - filaments
    Tungsten filaments offer a convenient ready prepared, reproducible evaporation sources.
    Average lead time: 1 day

    POA

    Average lead time: 1 day
  8. Evaporation boats
    Evaporation boats
    Average lead time: 1 to 12 days

    POA

    Average lead time: 1 to 12 days
  9. Molybdenum boats for aperture cleaning AGE446
    These boats accommodate several aperture discs which should be heated in a vacuum chamber to bright red heat for cleaning.
    Average lead time: 12 days

    POA

    Average lead time: 12 days
Filters
Page

14 products available

You've viewed 9 of 14 products

COVID-19 Update: We are operational today and continuing to process orders normally. Please see the News page for the latest updates.
FILTERS
VIEW PRODUCTS Cancel