Menu
ORDER ONLINE - quick & easy
AGENTS & DISTRIBUTORS - available worldwide
REQUEST QUOTES - fast online pricing
Filters

8 products available

You've viewed 8 of 8 products

  1. Ceramic Tipped Tweezers - Straight, flat, round tips
    Stainless steel tweezers with replaceable ceramic tips. Tip style: straight, flat, round.
    Average lead time: 1 day

    POA

    Average lead time: 1 day
  2. Ceramic Tipped Tweezers - Very fine, curved tips
    Stainless steel tweezers with replaceable ceramic tips. Tip style: very fine, curved.
    Average lead time: 1 to 19 days

    POA

    Average lead time: 1 to 19 days
  3. Ceramic Tipped Tweezers - Straight, flat, strong, pointed tips
    Stainless steel tweezers with replaceable ceramic tips. Tip style: straight, flat, strong, pointed.
    Average lead time: 1 to 28 days

    POA

    Average lead time: 1 to 28 days
  4. Replacement Tips for Ceramic Tipped Tweezers
    Ceramic replaceable tip tweezers - tips: straight, thin, fine, superior finish.
    Average lead time: 1 to 43 days

    POA

    Average lead time: 1 to 43 days
  5. Ceramic Tweezers
    These ceramic tweezers overcome the disadvantages of tweezers manufactured from conventional materials such as stainless steel, titanium and plastic.
    Average lead time: 1 to 19 days

    POA

    Average lead time: 1 to 19 days
  6. Ceramic Tipped Tweezers - Straight, strong, pointed tips
    Stainless steel tweezers with replaceable ceramic tips. Tip style: straight, strong, pointed. Special prices valid while stocks last. 
    Average lead time: 1 to 28 days

    POA

    Average lead time: 1 to 28 days
  7. Ceramic Tipped Tweezers - Thin, straight, fine tips
    Stainless steel tweezers with replaceable ceramic tips. Tip style: thin, straight, fine.
    Average lead time: 1 to 43 days

    POA

    Average lead time: 1 to 43 days
  8. Ceramic Tipped Tweezers - Straight, fine, pointed tips
    Stainless steel tweezers with replaceable ceramic tips. Tip style: straight, fine, pointed.
    Average lead time: 1 to 19 days

    POA

    Average lead time: 1 to 19 days
Filters

8 products available

You've viewed 8 of 8 products

PRICE & AVAILABILITY: Please note that while we are working closely with our suppliers to minimise any global supply chain issues, prices and availability may be subject to change at short notice.
FILTERS
VIEW PRODUCTS Cancel