- Falcon 175ml PP Centrifuge Tube, Conical Bottom, with Plug Seal Screw... AGG4565Falcon® 175ml polypropylene (PP) conical centrifuge tubes with 7,500 RCF rating. Sterile. Pack of 8.In Stock£12.00In Stock
- Transport Tubes with Security CapsTransport tubes available in 5ml or 10ml.Average lead time: 1 to 14 days
From £52.35
Average lead time: 1 to 14 days - Tamper Evident MicrotubesTamper evident microtubes available in five different colours.Average lead time: 1 to 14 days
From £19.94
Average lead time: 1 to 14 days - Blackline Microtubes and Storage boxesCompletely opaque tubes and boxes ideal for the storage of photo sensitive solutions.Average lead time: 1 to 14 days
From £10.03
Average lead time: 1 to 14 days - 5ml Preparation Tubes Conical5ml conical tubes ideal for solution preparation, both biological and chemical.Average lead time: 1 to 14 days
From £49.12
Average lead time: 1 to 14 days - 1.5ml Conical Microtubes1.5ml conical microtubes are available in nine different colours.Average lead time: 1 to 14 days
From £17.62
Average lead time: 1 to 14 days - Double Tamper Evident Bottle 200ml White CapDouble Tamper Evident Bottle with and without shrink-wrap neck ringAverage lead time: 1 to 14 days
From £37.68
Average lead time: 1 to 14 days - Tri-Pour beakersPolypropylene Tri-Pour® Beakers graduated in 10ml increments.Average lead time: 1 to 21 days
From £11.91
Average lead time: 1 to 21 days - Tight fitting caps for Tri-Pour beakersTight fitting caps for Tri-Pour beakersAverage lead time: 1 to 45 days
From £6.36
Average lead time: 1 to 45 days - Polyethylene graduated containersThese 125ml polyethylene cups with approximate volume graduations are ideal for mixing embedding materials.Average lead time: 1 day
From £10.91
Average lead time: 1 day - Polypropylene graduated containersSmall polypropylene containers with approximate volume graduations.Average lead time: 1 day
From £31.78
Average lead time: 1 day - Beakers - Graduated PolypropyleneGraduated polypropylene beakers for general laboratory use.Average lead time: 1 to 14 days
From £25.45
Average lead time: 1 to 14 days - Stacking beakersTapered polypropylene beakers with moulded graduations and non-drip pouring spouts.Average lead time: 1 to 45 days
From £17.46
Average lead time: 1 to 45 days - Storage containersAutoclavable wide neck polypropylene containers offering excellent chemical resistance, and supplied with unlined screw caps.Average lead time: 1 to 14 days
From £63.53
Average lead time: 1 to 14 days - Glass Petri dishesGlass Petri dishes with lids, available in borosilicate or Pyrex® glass.Average lead time: 1 to 14 days
From £22.17
Average lead time: 1 to 14 days - High vacuum storage containersAvailable in three sizes, the Vacu-Storr series of glass vacuum containers is designed for storage of materials sensitive to moisture, oxygen and other environmental gases.Average lead time: 1 to 21 days
From £236.98
Average lead time: 1 to 21 days - Polythene cupsA range of polythene cups, originally intended as stoppers, suitable for use as disposable flat embedding moulds.Average lead time: 1 to 14 days
From £5.65
Average lead time: 1 to 14 days - Polypropylene cups AGG3396Static free, graduated 30ml polypropylene cups, ideal for preparing water for glass or diamond knife troughs.In Stock£5.90In Stock
- Aspirator bottle AGG3517Heavy duty five litre polythene bottle with carrying handle and drain tap.In Stock£30.96In Stock
- Specimen containers for CPDSpecimen containers for processing specimens in a critical point dryer.Average lead time: 1 to 21 days
From £35.16
Average lead time: 1 to 21 days - Beaker and FunnelFunnel for the transfer of photographic chemicals.Average lead time: 1 day
From £4.92
Average lead time: 1 day - Parafilm MParafilm M® is a moisture-resistant two-way stretch self sealing film for temporary sealing of laboratory glassware.Average lead time: 1 to 14 days
From £53.80
Average lead time: 1 to 14 days - Storage/transport tubes for SEM stubsTubes for storing and transporting SEM specimens, designed to hold 12.5mm pin stubs and larger pin stubs up to 38mm.Average lead time: 1 day
From £4.07
Average lead time: 1 day - Storage box for SEM stub tubesStrong cardboard box with an insert which holds 10 x AGG3626 SEM stub storage tubes.Average lead time: 1 to 14 days
From £7.68
Average lead time: 1 to 14 days