Menu
ORDER ONLINE - quick & easy
AGENTS & DISTRIBUTORS - available worldwide
REQUEST QUOTES - fast online pricing
Filters
Page

18 products available

You've viewed 9 of 18 products

  1. Geller reference standard MRS-3
    The MRS-3 is a universal magnification calibration standard suitable for a wide range of instrumentation. Magnifications from 10X to 50,000X. 2µm minimum pitch. Traceable to national labs for ISO9000 and ISO17025.
    Average lead time: 30 days

    POA

    Average lead time: 30 days
  2. Geller reference standard MRS-4
    A fifth Generation, high magnification reference standard for instrument calibration from 10X to 200,000X (1/2µm minimum pitch). NIST and NPL traceable for ISO9000 and ISO17025.
    Average lead time: 30 days

    POA

    Average lead time: 30 days
  3. Geller reference standard MRS-6
    A fifth generation Magnification Reference Standard & Stage Micrometer for instrument calibration from 1,500X to 1,000,000X (80nm minimum pitch). NIST and NPL traceable for ISO9000 and ISO17025.
    Average lead time: 30 days
    Average lead time: 30 days
  4. Geller reference standard re-callibration service
    Geller MicroAnalytical magnification standards can be cleaned and re-certified to assure continued use as a traceable standard.
    Average lead time: 21 days

    POA

    Average lead time: 21 days
  5. 145nm AFM Reference Standard for AFM
    The 145nm pitch is accurate to ±1nm.
    Average lead time: 14 days

    From £928.85

    Average lead time: 14 days
  6. 292nm pitch resolution reference standards for AFM
    292nm pitch reference standard for very high resolution calibration of AFM.
    Average lead time: 14 days

    POA

    Average lead time: 14 days
  7. 2-D holographic array standards
    2-D holographic array standards for simultaneous calibration of X and Y axes.
    Average lead time: 14 to 30 days

    POA

    Average lead time: 14 to 30 days
  8. Highly ordered pyrolytic graphite (HOPG)
    HOPG is widely used as a substrate for specimens to be examined in scanning probe microscopy.
    Average lead time: 1 to 45 days

    From £118.41

    Average lead time: 1 to 45 days
  9. Gold calibration kit
    Gold colloids of known size provide a reliable means of characterising tip geometry and calibrating the Z-axis to piezoelectric response.
    Average lead time: 14 days

    From £116.04

    Average lead time: 14 days
Filters
Page

18 products available

You've viewed 9 of 18 products

COVID-19 Update: We are operational today and continuing to process orders normally. Please see the News page for the latest updates.
FILTERS
VIEW PRODUCTS Cancel