- Parallel Bar 50 Mesh with Single Bar TEM Support Grids50 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids. Special prices valid while stocks last.Average lead time: 1 to 10 days
From £13.80
Average lead time: 1 to 10 days - Parallel Bar 150 Mesh TEM Support Grids150 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold. Special prices valid while stocks last.Average lead time: 1 to 10 days
From £15.15
Average lead time: 1 to 10 days - Parallel Bar 50 Mesh TEM Support Grids50 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold. Special prices valid while stocks last.Average lead time: 1 to 10 days
From £13.80
Average lead time: 1 to 10 days - R2 Rotator with 1051 Head AG1050Low-speed mixer for EM specimen infiltration preparations (0.5 - 7.5 RPM), design provides two angles 55° or 35°. Special prices valid while stocks last.In StockSpecial Price £554.73 was £1,095.51 You save: £648.94 (49%)In Stock
- Formvar carbon films on NickelThin cast films of Formvar have been strengthened with the addition of a layer of evaporated carbon on nickel grids. Special prices valid while stocks last.Average lead time: 1 to 24 days
From £79.67
Average lead time: 1 to 24 days - Boron carbide standard AGS144Small boron carbide particles. Special prices valid while stocks last.In StockSpecial Price £2.69 was £20.34 You save: £21.18 (87%)In Stock
- Ultra-smooth carbon foilsUltra-smooth carbon foils, manufactured by ACF Metals, have been prepared in ultra-clean conditions to yield films that are effectively structureless when viewed at high magnifications in the EM. Special prices valid while stocks last.Average lead time: 10 to 71 days
From £248.11
Average lead time: 10 to 71 days - IdentigridsThese unique grids are manufactured only by Agar Scientific to provide positive identification of a specimen throughout its handling. Special prices valid while stocks last.Average lead time: 1 to 26 days
From £3.70
Average lead time: 1 to 26 days - Indexed Micropore Silicon Nitride Membrane, Hexagonal Arrangement500μm x 500μm aperture in 200nm low-stress silicon nitride membrane. 6 micropore sizes. Hexagonal arrangement. Pack of 10. Special prices valid while stocks last.Average lead time: 1 to 26 days
POA
Average lead time: 1 to 26 days - Crystal SubstratesHigh purity optical grade single crystals of sodium chloride, potassium bromide and potassium chloride are excellent substrates for growing epitaxial films. Special prices valid while stocks last.Average lead time: 1 to 10 days
From £58.45
Average lead time: 1 to 10 days - Indium Wire AGE432Indium wire for high vacuum seals in clean systems. Special prices valid while stocks last.In StockSpecial Price £64.23 was £151.17 You save: £104.33 (58%)In Stock
- Apertures, 3.00 x 0.25mm, Molybdenum3.00mm dia, 0.25mm thick. Molybdenum. High quality disc apertures for use in electron microscopes, Focus Ion Beam, microprobe and X-ray systems. Special prices valid while stocks last.Average lead time: 1 to 66 days
From £55.29
Average lead time: 1 to 66 days - Thin Foil AperturesThin foil apertures are frequently used in the objective lenses of high resolution and electron beam lithography instruments. Special prices valid while stocks last.Average lead time: 1 to 24 days
From £75.25
Average lead time: 1 to 24 days - Apertures, 2.0 x 0.6mm, Molybdenum2mm dia, 0.6mm thick. Molybdenum. High quality disc apertures for use in electron microscopes, Focus Ion Beam, microprobe and X-ray systems. Special prices valid while stocks last.Average lead time: 1 to 66 days
From £55.53
Average lead time: 1 to 66 days - Silicon Carbide Pre-Grinding Paper DiscsWaterproof silicon carbide papers are often preferred for pre-grinding operations because of their rapid cutting properties and close grain size. Special prices valid while stocks last.Average lead time: 1 to 17 days
From £13.13
Average lead time: 1 to 17 days - Quantifoil R2/4 holey carbon films - CircularCircular, hole size 2µm dia, separation 4µm. Special prices valid while stocks last.Average lead time: 1 to 196 days
From £42.19
Average lead time: 1 to 196 days - Bio Diamant Paste Series 100Diamond powder pastes designed for grinding and polishing work.Average lead time: 31 days
From £74.76
Average lead time: 31 days - Bio Diamant Abrasive Suspension NEODIA PHigh performance polycrystalline diamond abrasive suspension.Average lead time: 31 days
From £37.23
Average lead time: 31 days - Apertures, 4.0 x 0.6mm, Platinum/Iridium4mm dia, 0.6mm thick. Platinum/Iridium. High-quality disc apertures for use in electron microscopes, Focus Ion Beam, microprobe and X-ray systems.Average lead time: 41 to 86 days
From £102.36
Average lead time: 41 to 86 days - Crystalbond AdhesivesCrystalbond adhesives allow temporary bonding of delicate crystals, metallurgical samples, glass components and ceramic substrates.Average lead time: 1 to 26 days
From £32.80
Average lead time: 1 to 26 days - Average lead time: 17 days
- Apertures, 1.85 x 0.1mm, Platinum/Iridium1.85mm dia, 0.1mm thick. Platinum/iridium. High quality disc apertures for use in electron microscopes, Focus Ion Beam, microprobe and X-ray systems.Average lead time: 1 to 66 days
From £111.99
Average lead time: 1 to 66 days - CAMEO Disc Silver, Rhodium & Gold Grinding and Pre-polishing DiscsSilver, gold and rhodium grinding and pre-polishing discs, designed to be used with the Bio Diamant abrasive suspensions.Average lead time: 31 days
From £107.55
Average lead time: 31 days - Athene Type 12, 300 Mesh Thick Bar/Thin Bar TEM GridsThick bar/thin bar grids. 300 mesh, 3.05mm diameter. Copper, Nickel, Platinised or Gilded.Average lead time: 24 days
From £14.72
Average lead time: 24 days