Menu
ORDER ONLINE - quick & easy
AGENTS & DISTRIBUTORS - available worldwide
REQUEST QUOTES - fast online pricing
Filters
Page

2241 products available

You've viewed 24 of 2241 products

  1. High Precision Pin Vise Handle and Precision Ground Diamond Scribes
    High precision pin vise handle machined from the finest materials.
    Average lead time: 29 days

    POA

    Average lead time: 29 days
  2. EPO-TEK H70E Epoxy AG16017
    EPO-TEK® H70E Thermally Conductive Epoxy.
    Average lead time: 29 days

    POA

    Average lead time: 29 days
    Down
    Up
  3. Copper foil on aluminium grid AGS149
    This dual-purpose specimen determines detector efficiency, generating two well separated K lines to check the calibration of the X-ray detector.
    Call for leadtime

    POA

    Call for leadtime
    Down
    Up
  4. Tantalum Apertures
    Tantalum final apertures are for SEM use where X-ray analysis of biological material is being undertaken.
    Average lead time: 69 days

    POA

    Average lead time: 69 days
  5. Stainless Steel Discs
    These stainless steel discs have etched holes and are mainly used for gas flow control, pressure testing and filtering of particles.
    Average lead time: 6 days

    POA

    Average lead time: 6 days
  6. Spray apertures, 12.68 x 0.25mm, Molybdenum
    12.68mm dia, 0.25mm thick. Profile A. Used in Cambridge/LEO/Zeiss and Camscan scanning electron microscopes.
    Average lead time: 69 days

    POA

    Average lead time: 69 days
  7. Apertures with square holes - 2mm dia, 0.6mm thick
    Apertures with square holes manufactured from platinum.
    Average lead time: 44 days

    POA

    Average lead time: 44 days
  8. Apertures with square holes - 3.04mm dia, 0.25mm thick
    Apertures with square holes manufactured from platinum.
    Average lead time: 69 days

    POA

    Average lead time: 69 days
  9. Cryo-Aprons
    Cryo-Aprons offer protection from splashes and ultra-cold applications. 
    Average lead time: 6 to 13 days

    POA

    Average lead time: 6 to 13 days
  10. AFM Disc Gripper
    This AFM disc gripper has been specially designed with rubber coated tips for picking up discs from a flat surface.
    Average lead time: 9 to 44 days

    POA

    Average lead time: 9 to 44 days
  11. Sable hair brushes
    Sable hair brushes for delicate manoeuvring of specimens and grids.
    Average lead time: 1 day

    POA

    Average lead time: 1 day
  12. Acheson Silver DAG 1415M
    The genuine replacement for DAG 915, used widely in electron microscopy and electronic circuitry for capacitor terminations, electrostatic screening, coating of UHF reflectors and electroplating on non-conductors.
    Average lead time: 1 day

    POA

    Average lead time: 1 day
  13. Storage racks, metal
    Metal cabinets with plastic drawers.
    Average lead time: 13 days

    POA

    Average lead time: 13 days
  14. Slide Marker
    An area selected under the microscope can be marked for future reference by replacing the objective lens by the objective marker.
    Average lead time: 1 to 59 days

    POA

    Average lead time: 1 to 59 days
  15. Insect Pins
    Insect pins: 0.2 x 12mm, 0.1 x 12mm, 0.25 x 38mm.
    Average lead time: 13 days

    POA

    Average lead time: 13 days
  16. Epoxy Resins
    Epoxy resins for the preparation and sectioning of specimens for TEM.
    Average lead time: 1 to 29 days

    POA

    Average lead time: 1 to 29 days
  17. Hardeners for Epoxy Resins
    Hardeners for epoxy resins
    Average lead time: 1 to 20 days

    POA

    Average lead time: 1 to 20 days
  18. Buffers
    Some buffers are toxic and should be handled with the same care as fixatives.
    Average lead time: 1 to 29 days

    POA

    Average lead time: 1 to 29 days
  19. Antifadent (AF) solutions
    Phosphate buffered saline solution containing antifadent, specially prepared for use with UVM 3 solution where fluorochrome fading is a problem.
    Average lead time: 6 to 29 days

    POA

    Average lead time: 6 to 29 days
  20. Quantifoil S7/2 holey carbon films - Square
    Square hole, size 7 x 7µm, bar width 2µm.
    Average lead time: 139 to 179 days

    POA

    Average lead time: 139 to 179 days
  21. Quantifoil R1.2/1.3 holey carbon films - Circular
    Circular hole, size 1.2µm dia, separation 1.3µm, pitch 2.5µm.
    Average lead time: 1 to 199 days

    POA

    Average lead time: 1 to 199 days
  22. Quantifoil R1/4 holey carbon films - Circular
    Circular, hole size 1µm dia, separation 4µm.
    Average lead time: 1 to 179 days

    POA

    Average lead time: 1 to 179 days
  23. SEM Stub Grippers
    These scissor-shaped grippers are useful for handling SEM specimen stubs.
    Average lead time: 1 to 44 days

    POA

    Average lead time: 1 to 44 days
  24. Diamond Scriber, fine point
    A diamond scriber with a very fine point.
    Average lead time: 1 day

    POA

    Average lead time: 1 day
Filters
Page

2241 products available

You've viewed 24 of 2241 products

PRICE & AVAILABILITY: Please note that while we are working closely with our suppliers to minimise any global supply chain issues, prices and availability may be subject to change at short notice.
FILTERS
Capacity
Colour
Hole Arrangement
Hole Diameter
Manufacturer
Maximum Capacity
Mesh Size
Model
Slot Size
Microscope Make
Range
Diameter
Material
Mesh Shape
Size
Thickness
Style
VIEW PRODUCTS Cancel